Before I could finish my airplane a hangar was needed.

Building  hangar 32D at LVN.

The top 12 inches of soil was removed and replaced with sand.

This is a pole barn type construction with treated poles on 4 ft centers.

An overhead IR heater is used. It is mounted on the 16 ft ceiling.
 

Build a hangar and the airplanes will come.

Back to N94KB Home